Skip to content
All articles
Equipment8 min

Solar panels price in BiH (2026): prices of 6, 10, and 15 kW power plants

How much do solar panels for a house cost in BiH? Turnkey prices from 7,400 KM, savings, payback, and Operator for OIEiEK subsidy up to 7,000 KM

Author · Electrical engineerErmin Bošnjaković

Solar panels price in BiH (2026): how much does a home solar power plant cost

Updated: Nov 23, 2026 · E. Bošnjaković, electrical engineer

Summary: Solar panels for a house in BiH, that is, a turnkey solar power plant, cost from 7,400 KM for 6 kW to 14,990 KM for 15 kW, including VAT, installation, and paperwork. The most requested system is 10 kW for 10,990 KM, which saves about 2,162 KM annually and pays off in about 5.1 years, and with the Operator for OIEiEK subsidy in about 2 years. A hybrid system, ready for a battery, is 2,000 to 3,000 KM more expensive. With the Operator for OIEiEK subsidy (up to 7,000 KM) or a GEFF loan (up to 20% cashback), the price is significantly lower.

How much do solar panels for a house cost in BiH?

An on-grid solar power plant for a house in BiH costs from 7,400 to 14,990 KM, depending on capacity. Prices are turnkey: panels, inverter, mounting structure, installation, project design, paperwork for grid connection, and commissioning. Along with the price, annual savings are also stated, as they determine how quickly the investment pays off.

Package (on-grid system)

Capacity

Price incl. VAT

Annual production

Annual savings

Payback

Start 6

6 kW

7,400 KM

7.2 MWh

~1,297 KM

~5.7 yrs.

Plus 10

10 kW

10,990 KM

12 MWh

~2,162 KM

~5.1 yrs.

Max 15

15 kW

14,990 KM

18 MWh

~3,108 KM

~4.8 yrs.

Business 50+ (companies)

50 kW

59,000 KM

59.9 MWh

~10,361 KM

~5.7 yrs.

Prices apply to a pitched sheet metal roof. Panels are N-type TOPCon, and inverters are from Tier 1 manufacturers. A larger power plant has a lower price per kW, so it pays off faster: 6 kW costs around 1,233 KM per kW, and 15 kW around 999 KM per kW. A detailed calculation for 10 kW is in the article Solar power plant 10 kW: price and profitability.

How much does a hybrid system and a solar battery cost?

A hybrid system costs 2,000 to 3,000 KM more than an on-grid system of the same capacity. The panels are the same, and the difference is in the inverter, which manages the panels, the grid, and the battery. You can add a battery immediately or later, without replacing equipment.

Package (hybrid system)

Capacity

Price incl. VAT

Annual savings

Payback

Start 6

6 kW

9,400 KM

~1,402 KM

~6.7 yrs.

Plus 10

10 kW

13,990 KM

~2,337 KM

~6.0 yrs.

Max 15

15 kW

17,990 KM

~3,406 KM

~5.3 yrs.

A hybrid Plus 10 with a 10 kWh solar battery costs from 17,100 KM. A hybrid system provides higher self-consumption and electricity when there is no grid. An on-grid system has the lowest price and the fastest payback. Hybrid inverters also come with a longer warranty: 10 years, compared to 5 for on-grid ones. More on choosing: Hybrid or on-grid solar power plant 10 kW.

How many kW of solar panels do you need?

Capacity is chosen according to annual consumption, not according to roof size. In BiH, 1 kW of panels generates about 1,200 kWh annually, so the rule is simple: annual consumption in kWh divided by 1,200.

Your situation

Recommended capacity

Package

Average household, bill up to 150 KM per month

6 kW

Start 6

House with a heat pump or an electric car

10 kW

Plus 10

Larger house, vacation home, or small business with high consumption

15 kW

Max 15

Company

from 50 kW

Business 50+

For a household, 10 kW is the most common choice. Up to 10.8 kW, a prosumer uses net metering, so every kWh fed into the grid is worth the same as one taken from it. Above that limit, surplus is accounted for through net billing and is worth less.

What raises or lowers the price of solar panels?

  • Roof type. Prices in the tables apply to a pitched sheet metal roof. On a tiled roof, installation is more demanding, so the quote is about 9.1% more expensive. Plus 10 on tiles costs 11,990 KM.

  • Distance. Prices apply to locations up to 30 km from Sarajevo. For other locations, we confirm the price after a site inspection.

  • Una-Sana Canton. Due to special requirements of the power distribution company, prices for USK are provided on request only.

  • Hybrid inverter and battery. A hybrid system is 2,000 to 3,000 KM more expensive, and a 10 kWh battery adds about another 3,100 KM.

  • Capacity. Every additional kW is cheaper than the previous one, so a larger system has a lower price per kW.

Certain online complete set offers of around 9,990 KM include only equipment and installation, without the project design, certified technical documentation, and testing. Before comparing, check what is included in the price: Solar power plant 10 kW: what is included in the price.

How to pay less: Operator for OIEiEK subsidy, GEFF, and Eco Fund

Operator for OIEiEK subsidy (Federation of BiH). Households becoming prosumers can receive a subsidy of up to 60% of the investment, maximum 7,000 KM. The requirement is an annual consumption of at least 4,500 kWh, and the deadline for the public call is Dec 31, 2026. The subsidy applies only to power plants up to 10.8 kW, so Max 15 is not eligible. For Plus 10, the subsidy is about 6,594 KM, reducing the payback from 5.1 to about 2 years. Everything about the call: Subsidy for solar panels in FBiH.

GEFF loan (entire BiH). Through the GEFF program, banks and microcredit organizations refund up to 20% of the loan amount for a solar power plant. For Plus 10, this shortens payback from about 5.1 to about 4.1 years. Calculation: GEFF loan for solar power plants.

Eco Fund (Republika Srpska). The Environmental Protection and Energy Efficiency Fund of RS issues an annual public call that also covers solar power plants, up to 50% of costs and a maximum of 5,000 KM.

Solar panels in Sarajevo, Banja Luka, Tuzla, and Mostar: does the price differ?

The panels and inverters are the same, but transport, roof conditions, and power distribution rules differ from place to place.

  • Solar panels Sarajevo: prices from the tables apply to locations up to 30 km from Sarajevo.

  • Solar panels Tuzla, Mostar, Zenica: the same equipment and procedure, and the price is confirmed after a site inspection. Grid connection is carried out by EP BiH or EP HZHB.

  • Solar panels Banja Luka and Republika Srpska: Enora and our partners hold licenses for executing works in RS. The procedure differs from the Federation, which we explain in the guide for prosumers in Republika Srpska.

  • Una-Sana Canton: price on request only.

In all locations, we prepare complete documentation for grid connection.

Why Enora

Enora d.o.o. from Sarajevo designs and builds solar power plants for prosumers and businesses. The price is turnkey with no hidden costs:

  • project design and complete grid connection paperwork included in the package price;

  • N-type TOPCon panels and Tier 1 inverters;

  • warranties: panels 30 years, hybrid inverters 10 years, on-grid inverters 5 years, workmanship 5 years;

  • assistance with the Operator for OIEiEK subsidy and GEFF loan.

Request a quote: send an electricity bill via WhatsApp to +387 67 129 6666 or +387 67 149 6666. We will reply with the right capacity for you, how much you will save, and the exact price for your roof. View all packages →

Frequently Asked Questions

How much does a 10 kW solar power plant cost in BiH? A 10 kW on-grid system costs 10,990 KM incl. VAT, turnkey, on a sheet metal roof. A hybrid system costs 13,990 KM, and with a 10 kWh battery from 17,100 KM.

In how many years do solar panels pay off? On-grid systems pay off in 4.8 to 5.7 years, and hybrid ones in 5.3 to 6.7 years. With the Operator for OIEiEK subsidy, Plus 10 pays off in about 2 years, and with a GEFF loan in about 4.1 years.

How many solar panels are needed for a house? For an average household with a bill up to 150 KM per month, 6 kW is sufficient, or about 13 panels of 450 W. A house with a heat pump or an electric car needs about 10 kW.

Is the price the same across all of BiH? Prices from the tables apply up to 30 km from Sarajevo. For other locations, we confirm the price after a site inspection, and for Una-Sana Canton on request only.

Can I get a subsidy for solar panels? In the Federation of BiH, the Operator for OIEiEK provides up to 60% of the investment, maximum 7,000 KM, for power plants up to 10.8 kW. In Republika Srpska, the Eco Fund launches an annual call with support up to 5,000 KM.

What is a prosumer? A prosumer, or consumer-producer, is a household that generates its own electricity and feeds the surplus into the grid. Up to 10.8 kW, the surplus is accounted for kilowatt for kilowatt.

Sources

Have a specific question?

An engineer replies within 24 hours, with no obligation.

Request a quote
Get in touch