Skip to content

Packages

Three packages for homes, tailored solutions for businesses

No online checkout: choose an indicative package, request a quote and we confirm the exact configuration and price after a site visit.

Grid-tied system

indicatively from7,400 KM

Start 6

6 kW · grid-tied inverter

For an average household with a bill of up to 150 KM a month.

indicatively from

7,400 KM

Production
7.2MWh/yr
Savings
~1,297KM/yr
Payback
~5.7yrs
  • 6 kW of panels · N-type TOPCon
  • Tier 1 grid-tied inverter, single-phase

Plus 10

10 kW · grid-tied inverter

Most popular

Our most requested package: home, heat pump and electric car.

indicatively from

10,990 KM

Production
12MWh/yr
Savings
~2,162KM/yr
Payback
~5.1yrs
  • 10 kW of panels · N-type TOPCon
  • Tier 1 grid-tied inverter, three-phase

Max 15

15 kW · grid-tied inverter

For larger homes, holiday homes and small businesses using more power.

indicatively from

14,990 KM

Production
18MWh/yr
Savings
~3,108KM/yr
Payback
~4.8yrs
  • 15 kW of panels · N-type TOPCon
  • Tier 1 grid-tied inverter, three-phase

Business 50+

50 kW · grid-tied inverter

For businesses

For businesses: from 50 kW to multiple MW, with CBAM and ESG reporting.

indicatively from

59,000 KM

Production
59.9MWh/yr
Savings
~10,361KM/yr
Payback
~5.7yrs
  • 50 kW of panels · bifacial
  • Tier 1 grid-tied inverter, three-phase

Hybrid system

indicatively from9,400 KM

Start 6

6 kW · hybrid inverter

For an average household with a bill of up to 150 KM a month.

indicatively from

9,400 KM

Production
7.2MWh/yr
Savings
~1,402KM/yr
Payback
~6.7yrs
  • 6 kW of panels · N-type TOPCon
  • Tier 1 hybrid inverter, single-phase
  • Battery-ready (hybrid inverter)

Plus 10

10 kW · hybrid inverter

Most popular

Our most requested package: home, heat pump and electric car.

indicatively from

13,990 KM

Production
12MWh/yr
Savings
~2,337KM/yr
Payback
~6.0yrs
  • 10 kW of panels · N-type TOPCon
  • Tier 1 hybrid inverter, three-phase
  • Battery-ready (hybrid inverter)

Max 15

15 kW · hybrid inverter

For larger homes, holiday homes and small businesses using more power.

indicatively from

17,990 KM

Production
18MWh/yr
Savings
~3,406KM/yr
Payback
~5.3yrs
  • 15 kW of panels · N-type TOPCon
  • Tier 1 hybrid inverter, three-phase
  • Battery-ready (hybrid inverter)

Prices are indicative, in BAM (KM), for a pitched sheet-metal roof within 30 km of Sarajevo; on a tiled roof the quote is 9.1 % higher. Through the public call of the FBiH Renewable Energy Operator (OIEiEK), households can get a grant of half the reference price of 1,829 KM per kW, at most 60% of the investment and at most 7,000 KM; Max 15 doesn't qualify, as it exceeds 10.8 kW and is settled by net billing. We prepare all the paperwork.

Grid-tied or hybrid

Which system suits your home?

The panels are the same; the inverter makes the difference. It comes down to how much power during an outage matters to you and whether you plan a battery.

indicatively from
7,400 KM

Grid-tied system

The inverter works with the grid: it powers the house by day and sends the surplus to the grid, which comes back to you through prosumer billing.

  • Lowest price and fastest payback
  • When the grid goes down, so does the plant

For homes with a reliable grid that want the lowest possible bill.

indicatively from
9,400 KM

Hybrid system

A hybrid inverter manages the panels, the grid and a battery. Add the battery now or later, without replacing any equipment.

  • More self-consumption, more savings
  • With a battery, power even during an outage
  • Ready for a battery, a heat pump and an EV

For homes with frequent outages or a battery in mind.

The hybrid version costs 2,000 KM to 3,000 KM more than a grid-tied one of the same size.

Packages

Package comparison

Estimates for a south-facing pitched roof in Sarajevo, grid-tied and hybrid.

Package comparison · Grid-tied system
FeatureStart 6Plus 10Most popularMax 15Business 50+For businesses
Power6 kW10 kW15 kW50 kW
PanelsN-type TOPConN-type TOPConN-type TOPConbifacial
InverterSingle-phaseThree-phaseThree-phaseThree-phase
Roof area required~30 m²~50 m²~75 m²~250 m²
Annual production7.2 MWh12 MWh18 MWh59.9 MWh
CO₂ avoided per year3.6 t6 t9 t29.9 t
MonitoringEnora CloudEnora CloudEnora CloudEnora Cloud
Annual savings~1,297 KM~2,162 KM~3,108 KM~10,361 KM
Payback period~5.7 yrs~5.1 yrs~4.8 yrs~5.7 yrs
Warranty panels / inverter30 / 5 yrs30 / 5 yrs30 / 5 yrs30 / 5 yrs
Indicative pricefrom 7,400 KMfrom 10,990 KMfrom 14,990 KMfrom 59,000 KM

Prices are indicative, in BAM (KM), for a pitched sheet-metal roof within 30 km of Sarajevo; on a tiled roof the quote is 9.1 % higher. Through the public call of the FBiH Renewable Energy Operator (OIEiEK), households can get a grant of half the reference price of 1,829 KM per kW, at most 60% of the investment and at most 7,000 KM; Max 15 doesn't qualify, as it exceeds 10.8 kW and is settled by net billing. We prepare all the paperwork.

Which package is mine?

A package to match your electricity bill

A quick estimate from your monthly bill and town. For the full calculation with a heat pump and an electric car, open the calculator.

160 KM
40 KM800 KM

We suggest

Start 6

Size needed~6.5 kWp

We suggest: Start 6

For an average household with a bill of up to 150 KM a month.

Grid-tied
from 7,400 KM
Savings ~1,297 KM/yr
Hybrid
from 9,400 KM
Savings ~1,402 KM/yr

Heat pumps and air conditioners, R290 and R32

Heating, cooling and hot water on electricity. With a solar plant, you heat with your own energy. from 7,400 KM · Solar plant + heat pump bundle from 22,900 KM

Heat pumps

Package questions

Before you choose a package

If your question isn't here, write to us or call. We answer with no obligation.

Get in touch