Subsidies for Solar Panels in FBiH: Up to 7,000 KM for Your Home (2026)
Author: E. Bošnjaković, Electrical Engineer, Enora d.o.o. · Updated: November 16, 2026.
In brief: The Operator za OIEiEK opened a public call on October 1, 2026, for households in the Federation of BiH. Family homeowners can receive 50 % of the benchmark construction cost of a solar power plant, up to a maximum of 7,000 KM and no more than 60 % of the costs verified by invoices. A total of 2.8 million KM has been allocated for citizens, and the call remains open until the funds are exhausted, at the latest until December 31, 2026. Applications are processed on a first-come, first-served basis, meaning that the first step is preparing the design project.
Your electricity bill will not reduce itself, but this autumn an opportunity has emerged to recover a significant portion of the money invested in a solar power plant. Below is everything the rules actually state, without jargon and without promises we cannot keep.
What Is This Subsidy and Who Is It For?
The program run by the Operator for Renewable Energy Sources and Efficient Cogeneration (Operator za OIEiEK) co-finances the construction of residential solar power plants with a capacity of up to 10.8 kW. Such a household is called a prosumer: it purchases electricity, but consumes part of its own generation and feeds any surplus back into the grid.
The program covers two beneficiary groups:
Socially vulnerable households nominated by cantonal ministries and social work centers. For them, the Operator covers the entire cost, from the design project to grid connection.
All other citizens apply via the public call and receive a reimbursement for a portion of the cost. This article focuses on this group.
It is important to know that the funds are disbursed only after construction. You initially pay for the power plant yourself, and the reimbursement is issued once the plant is built and commissioned, after you sign the agreement with the Elektroprivreda DSO (ODS), and submit the required documentation.
Who Is Eligible for the Subsidy?
According to the published Program and public call, the requirements are that:
you are a natural person, owner or co-owner of a family house in the Federation of BiH;
you have a registered permanent address at the property location for at least 90 days prior to the publication of the program;
at least 50 % of the building's floor area is used for residential purposes;
annual electricity consumption over the last 12 months exceeds 4,500 kWh;
the planned capacity of the power plant does not exceed the connection capacity of your household, up to a total maximum of 10.8 kW.
Always verify the exact thresholds in the official text of the public call on oieiek.ba, as it is the authoritative source.
How Much Money Can You Receive?
The Operator reimburses 50 % of the benchmark construction cost per kilowatt. For 2026, this benchmark cost is 1,829 KM per kW. The total amount cannot exceed 7,000 KM, nor can it exceed 60 % of the construction costs verified by invoices. Whichever amount is lower applies.
The maximum possible amount according to the benchmark cost:
Power plant capacity | Benchmark cost | 50 % of that | Maximum possible subsidy |
|---|---|---|---|
5 kW | 9,145 KM | 4,572.50 KM | 4,572.50 KM |
6 kW | 10,974 KM | 5,487 KM | 5,487 KM |
7 kW | 12,803 KM | 6,401.50 KM | 6,401.50 KM |
8 kW | 14,632 KM | 7,316 KM | 7,000 KM (upper cap) |
10 kW | 18,290 KM | 9,145 KM | 7,000 KM (upper cap) |
The amount for 6 kW (5,487 KM) was explicitly cited by the Operator itself. The upper limit of 7,000 KM is reached at around 7.7 kW.
These are the maximum figures. The actual amount you receive depends on the 60 % rule: if 60 % of your invoiced costs is less than the figure in the table, the smaller amount is paid out. This is why the real price of the power plant and what counts as an eligible cost are crucial. The program considers power plant equipment, connection equipment to the metering point, and installation and connection works as eligible costs.
What Does This Look Like With Our Packages?
Package | Price | 50 % of benchmark cost | 60 % of price | Subsidy you can count on |
|---|---|---|---|---|
Start 6, on-grid | 7,400 KM | 5,487 KM | 4,440 KM | approx. 4,440 KM |
Start 6, hybrid | 9,400 KM | 5,487 KM | 5,640 KM | approx. 5,487 KM |
Plus 10, on-grid (sheet metal roof) | 10,990 KM | 7,000 KM | 6,594 KM | approx. 6,594 KM |
Plus 10, on-grid (tile roof) | 11,990 KM | 7,000 KM | 7,194 KM | 7,000 KM |
Plus 10, hybrid | 13,990 KM | 7,000 KM | 8,394 KM | 7,000 KM |
You qualify for the full 7,000 KM only when eligible costs exceed roughly 11,670 KM. The Max 15 package (15 kW) exceeds the 10.8 kW ceiling, making it ineligible for this subsidy. This calculation is based on the published rules, and the final amount is determined by the Operator.
What Documents Need to Be Prepared?
identity card;
certificate of residence;
electricity bills for the past 12 months or a consumption statement;
electro-energetic consent (power grid permit) for connecting the power plant;
statement accepting the terms of the program;
proof of payment of the administrative fee.
How to Obtain the Subsidy, Step by Step
Check the requirements. Review your electricity bills: consumption over 4,500 kWh annually is the key criterion.
Commission the design project. This is the first step. The design project determines the capacity and technical setup of the plant, and all other documentation is based on it, including the application for electro-energetic consent. If you choose one of our packages, the design project is included in the package price.
Obtain the electro-energetic consent from the competent distributor.
Submit the application to the Operator with the documentation and proof of administrative fee payment. The application can be approved before construction.
Build the power plant and commission it.
Sign the agreement with the DSO (ODS) and submit the payout documentation. Reimbursement is disbursed following construction, commissioning, and the signing of the agreement.
An application can be approved prior to construction, but the Operator only pays out the funds once the power plant is commissioned and the agreement with the Elektroprivreda DSO (ODS) is signed.
Why Is the Design Project the First Step and How Much Does It Cost With Us?
Without a design project, there is neither consent nor an application, and applications are processed strictly in order of arrival. Whoever gets their complete documentation together first secures a better position.
With us, there are two ways to obtain the design project:
Included with a package. If you purchase the power plant as a turnkey package (Start 6, Plus 10, or a hybrid version), the design project is always included in the package price with no additional charge. The package prices listed in this article already include the design project.
Separately. If you only need the design project, for example to submit the application before deciding on an installer, the project costs 936 KM. If you subsequently decide to build the power plant with us, we apply a 351 KM discount on the plant for that project, meaning the project effectively costs you 585 KM.
The Operator's program lists plant equipment, connection equipment, and installation with grid connection as eligible costs, while design documentation is not explicitly mentioned. Therefore, the subsidy amounts in this article are calculated based on package prices, rather than a separately purchased design project.
How Long Will the Call Remain Open?
The public call was published on October 1, 2026. It is open until the funds are exhausted, with a final deadline of December 31, 2026. A budget of 2.8 million KM is earmarked for households in the “other citizens” category, within a total program value of 4 million KM. The Operator expects to support approximately 500 power plants with an average capacity of 6 kW. This means the funds may run out well before the deadline expires.
What If I Do Not Meet the Requirements?
If your consumption falls below the threshold, you do not own the property, or the required power plant exceeds your connection capacity, a solar installation can still be financially viable—it simply takes longer to amortize. We explained financing through a loan with cashback of up to 20 % in our article on the GEFF loan. The subsidy is a bonus, not the sole reason to purchase. You can send your electricity bills to us, and we will evaluate together whether you qualify for the subsidy and determine the plant's return on investment without it.
Frequently Asked Questions
What is the maximum subsidy for solar panels in FBiH? A maximum of 7,000 KM per project, and no more than 60 % of the costs verified by invoices. The exact amount depends on the system capacity and actual costs. For our on-grid Plus 10 priced at 10,990 KM, this is roughly 6,594 KM; we explain the profitability of the entire package in our article on 10 kW solar plants.
Is the subsidy paid out in advance? No. Households in the “other citizens” category must first finance the construction themselves, receiving reimbursement after construction, commissioning, signing the agreement with the DSO, and submitting documentation.
Who is not eligible for the subsidy? Legal entities, as well as natural persons who are not the owners or co-owners of the family home where their official residence is registered. The program is intended for residential households in the Federation of BiH.
What is a prosumer? An electricity consumer who generates part of their own power, most commonly using rooftop solar panels, and feeds surplus electricity back into the grid.
How much does a residential solar power plant cost in BiH? For 2026, the Operator calculates an average of 1,829 KM per kW of installed capacity. Our packages are Start 6 (6 kW) starting from 7,400 KM for on-grid, or 9,400 KM for a hybrid setup, and Plus 10 (10 kW) from 10,990 KM, or 13,990 KM for a hybrid setup.
Can I receive a subsidy if I already have a solar power plant? The program co-finances the construction of new installations. Check the wording of the call to ensure your situation qualifies before paying the administrative fee.
Send Us Your Electricity Bills
We will review whether you meet the requirements, determine what system capacity we recommend, and estimate the subsidy amount you can expect. Reach out to us via WhatsApp or phone: +387 67 129 6666 and +387 67 149 6666 or submit an inquiry through our website.
Read More
10 kW Solar Power Plant: Price, Net Metering, and Payback Period
Hybrid or On-Grid 10 kW Solar Power Plant: Which Is More Profitable for a Home
GEFF Financing for Solar Power Plants: Return of Up to 20% on Investment
The information provided is based on publicly available data as of the update date. Final terms, amounts, and deadlines are determined by the Operator za OIEiEK public call.
Sources: Operator za OIEiEK Public Call, Household Prosumer Co-Financing Program (PDF).