10 kW Solar Power Plant: Price and Payback (2026)

How much a 10 kW solar power plant costs in FBiH, how net metering works, and the payback period in years.

Author · Electrical engineerErmin Bošnjaković

10 kW Solar Power Plant: Price, Net Metering, and Payback Period (2026)

Author: E. Bošnjaković, Electrical Engineer, Enora d.o.o. · Updated: November 16, 2026

Quick answer: A 10 kW solar power plant with us starts at 10,990 KM including VAT for a metal roof (Plus 10 package, installation and commissioning included), and 11,990 KM for a tiled roof. In Sarajevo, it produces about 12,000 kWh per year. With an electricity price of 0.234 KM/kWh (including network fees and VAT) and network fees paid on all retrieved energy, savings are about 2,170 KM per year, yielding an investment payback period of about 5.1 years. With the subsidy from Operator za OIEiEK, which for this price amounts to about 6,594 KM, the payback is about 2 years.

Plus 10 is our most requested package, so questions about it arrive every day. Here are answers to all of them, along with calculations you can verify on your electricity bill.

How much does a 10 kW solar power plant cost?

The Plus 10 package starts from 10,990 KM including VAT. Included in the price are 10 kW of N-type TOPCon panels, a Tier 1 three-phase on-grid inverter, as well as installation and commissioning. The price is indicative and applies to a pitched metal roof up to 30 km from Sarajevo; an engineer confirms the exact price following a roof inspection. A battery is not included in the price; it is added as a separate system if needed.

For comparison, Operator za OIEiEK calculates an average of 1,829 KM per kilowatt in its 2026 subsidy calculation, which is 18,290 KM for 10 kW.

The power plant project design is always included in the package price, with no extra charge. It is only charged separately if you order the project design alone, without building the power plant with us (936 KM, and 585 KM if you later decide to build with us).

What affects the price?

The price of 10,990 KM applies to a home with a metal roof. The final amount is affected by the following factors:

  • Roof type. If the house has a tiled roof, the Plus 10 package costs 11,990 KM.

  • Location. The stated price does not apply to the Una-Sana Canton, as Elektroprivreda BiH has specific requirements there. For that location, the price is provided upon request via an offer.

  • Inverter type. Plus 10 comes with an on-grid inverter. A hybrid inverter, which enables operation with a battery, is more expensive, and the battery is added separately.

  • Roof inspection. Prices are indicative, and an engineer confirms the exact amount after viewing the roof.

Warranties

  • panels: 30 years;

  • on-grid inverters: 5 years;

  • hybrid inverters: 10 years.

A hybrid inverter has a longer warranty period, but it is also more expensive.

How does net metering work?

Plus 10 is 10 kW, which is below the 10.8 kW limit. This means that as a household you can choose net metering. The rules for the Federation of BiH, as explained by Elektroprivreda BiH, are as follows:

  • The DSO installs a bidirectional meter for you that measures what you take from the grid and what you deliver to it.

  • Billing is monthly. If you retrieved more than you delivered, you pay the difference. If you delivered more, the surplus rolls over to the next month as an energy credit in kWh.

  • The credit is used only for the same energy type and the same tariff. A surplus generated during the day (high tariff - VT) offsets daytime consumption (VT), not nighttime consumption (low tariff - NT).

  • Credits expire after March 31, and unused credit is not paid out in cash.

  • Network fees are billed for the total energy you retrieve from the grid.

  • Households up to 10.8 kW can choose net metering for the first 10 years, after which they switch to net billing. There, surplus is worth less because it is calculated at the energy price reduced by 10%.

The Max 15 package (15 kW) exceeds the 10.8 kW limit, so net billing applies to it, not net metering.

Payback: calculation for 10 kW

Here is how we calculate it:

  • production in Sarajevo is 1,197 kWh per installed kW annually (PVGIS), meaning about 12,000 kWh for 10 kW;

  • a kWh on the VT tariff costs 0.234 KM, including network fees and VAT;

  • the network fee is around 0.097 KM/kWh with VAT (0.083 KM without VAT), which is an assumption you can replace with the value from your bill;

  • the house consumes about 12,000 kWh annually, consuming 45% of production directly, while the remaining 55% (6,600 kWh) is delivered to the grid and returned as an energy credit;

  • panels lose about 0.7% of production annually, and the price of electricity remains unchanged.

Item

Value

Price of Plus 10 package (metal roof)

10,990 KM

Annual production

about 12,000 kWh

Bill without power plant (12,000 kWh × 0.234 KM)

2,808 KM

Network fee you still pay (6,600 kWh × 0.097 KM)

about 640 KM

Savings in the first year

about 2,170 KM

Payback without subsidy

about 5.1 years

OIEiEK subsidy (60% of 10,990 KM)

about 6,594 KM

Payback with subsidy

about 2.0 years

Total savings over 10 years

about 21,000 KM

Electricity consumed directly saves the full 0.234 KM per kWh. Electricity delivered to the grid and later withdrawn as a credit saves less, because network fees are paid on everything you draw from the grid. This is why the payback period is shorter the more electricity you consume at the time of production—for example, for air conditioning, water heaters, or charging an electric car during the day:

Direct consumption

Delivered to grid

Annual savings

Payback without subsidy

20 %

9,600 kWh

about 1,875 KM

about 5.9 years

30 %

8,400 kWh

about 1,995 KM

about 5.5 years

45 %

6,600 kWh

about 2,170 KM

about 5.1 years

60 %

4,800 kWh

about 2,340 KM

about 4.7 years

The 7,000 KM subsidy is the upper limit. The Operator pays the lower of two amounts: 50% of the reference cost (for 10 kW that is 9,145 KM) or 60% of construction costs proven by invoices. For Plus 10 on a metal roof, 60% of 10,990 KM is 6,594 KM, so that is the amount you can count on. You only get the full 7,000 KM once eligible costs exceed about 11,670 KM. For a tiled roof (11,990 KM), the subsidy is therefore 7,000 KM, payback without subsidy is about 5.5 years, and with subsidy about 2.3 years. The project design is included in the package price, so payback in this calculation remains the same. Only if you do the project design separately, without building with us, the cost is 936 KM, or 585 KM with a 351 KM discount if you decide to build the power plant with us.

What this calculation does not take into account

  • Tariffs. Daytime credit does not cover nighttime consumption. If you use most of your electricity at night, self-consumption and a battery become more important.

  • Credit expiration. The surplus expires after March 31, so the plant should not produce significantly more than you consume annually.

  • The period after the 10th year. Then you transition to net billing, where surplus is worth less.

  • Prices. Both electricity prices and network fees may change, and with them the payback period.

  • Equipment. The warranty on the on-grid inverter is 5 years, and 30 years on the panels, so an inverter replacement cost is possible after the warranty expires.

Who is Plus 10 for, and who is it not for?

Plus 10 is best suited if you consume around 10,000 to 12,000 kWh annually, which is roughly 234 KM per month on your bill. It makes particular sense if you have a heat pump or charge an electric vehicle.

If you consume less, Start 6 (6 kW, from 7,400 KM, about 7.2 MWh annually) is a more sensible choice. For larger homes, vacation houses, and small businesses, there is Max 15 (15 kW, from 14,990 KM).

How we work

  1. Inquiry and consultation. Send your bill via WhatsApp or call us, and we will propose an estimated capacity.

  2. Inspection and quote. Free on-site visit, drone roof survey, PVGIS calculation, and a fixed quote.

  3. Project design and permits. Project design is included in the package price. Project design, power utility approvals, and preparation of subsidy documentation—we handle everything.

  4. Installation. In-house installation team; a residential system takes a few days.

  5. Connection. Smart meter, prosumer status agreement, and commissioning.

  6. Monitoring. Enora Cloud app and 24/7 alerts throughout the plant's lifetime.

From inquiry to commissioning typically takes 3 to 7 weeks. Deadlines for permits and grid connection are determined by institutions and the power utility, so we cannot influence them.

Frequently Asked Questions

How much does a 10 kW solar power plant cost in BiH? Our Plus 10 package starts from 10,990 KM with VAT for a metal roof, and costs 11,990 KM for a tiled roof, including installation and commissioning. The price does not apply to the Una-Sana Canton. Operator za OIEiEK calculates an average of 1,829 KM per kW for 2026.

How much electricity does a 10 kW power plant produce in Sarajevo? About 12,000 kWh annually, according to PVGIS data for Sarajevo (1,197 kWh per kW).

What is the payback period? With an electricity price of 0.234 KM/kWh and network fees on all retrieved energy, about 5.1 years without subsidies, and about 2 years with a subsidy, which amounts to about 6,594 KM for this price. The more electricity you consume directly, the shorter the payback period.

Can I use net metering with 10 kW? Yes. Households up to 10.8 kW can opt for net metering for the first 10 years. The capacity of the power plant must not exceed the approved connection capacity of your property.

What happens to excess electricity? It becomes an energy credit in kWh that rolls over to the next month. The credit expires after March 31 and is not paid out.

Do I need a battery? Not necessarily. Plus 10 is an on-grid system, and a battery can be added as a separate system if needed. The on-grid inverter shuts down during a power outage for safety reasons, so operating without the grid requires a hybrid system with a battery.

How long is the warranty? 30 years for panels, 5 years for on-grid inverters, and 10 years for hybrid inverters.

Can I get a subsidy for 10 kW? Yes, if you meet the terms of the Operator za OIEiEK public call, and the capacity is up to 10.8 kW. Check the requirements in our article on subsidies.

Send us your electricity bill

We will provide an estimated capacity, price, and payback within 24 hours, with no obligation. Contact us via WhatsApp or phone: +387 67 129 6666 and +387 67 149 6666, or fill out the inquiry form on the website.

Read also

Figures are indicative and based on public data as of the update date. The calculation assumes a network fee of about 0.097 KM/kWh including VAT and 45% direct consumption. The final price and terms are confirmed by the quote after a roof inspection.