250 kW on the roof, ready for 522 kWh of batteries. ☀️🔋
In Prijedor, we completed a larger power plant: 494 panels on the roofs of a commercial building, which will now cover a large part of its own consumption with solar energy. Surpluses are fed into the grid under the standard prosumer supply scheme.
What we installed:
494 × Tongwei TNC 505 W panels (249.47 kWp) 2 × Deye 125 kW hybrid inverters AC distribution and metering cabinets
We chose hybrid inverters so that a 522 kWh battery system could be added later without major modifications to the installation. That way, the power plant can grow together with the facility's needs.
Thinking about a solar power plant for your company, warehouse, or production facility? Send us a direct message or call us, and we will make a calculation for your facility.
📞 067 129 6666 🌐 enora.ba
Live · Enora Cloud
Today's production
Only the panels' production is shown, through Enora Cloud, with the owner's consent.